Riyadh, Saudi Arabia
![](https://hillsccl.com/wp-content/uploads/2022/11/Project1-1024x703.jpg)
- Supply, Installation, Testing & Commissioning the Following:
- Chilled water System (Air Cooled chillers, AHU’s, Pipes & Duct) with capacity 9000 TR+37000 TR/HR.
- Complete Plumbing Works with treatment station.
- Complete Fire Fighting Works (FM 200 + Sprinklers System).
- Complete Electrical Works (Power System, Lighting System, Earthling)
- Complete Low Current Works (CCTV, DATA Network, Telephone, Fire Alarm, Access Door).